Continued Reconstruction Success in Iraq
from the 15th to 27th of November, 2005
1. Completion of police stations in Babil, Basrah, Erbil, Kirkuk, Ninewa, and Salah ad Din Provinces, and a holding facility in Al Muthanna Province will provide approximately 250,000 people a safer environment and greater security as police operate from these improved facilities.
2. The completion of renovations to 12 schools in Baghdad, Basrah, and Al Anbar Provinces will equal a better learning environment and brighter future for over 7,200 Iraqi schoolchildren and 50 teachers.
3. Over 29 km of new roads between Qadisiyah Province and Wassit Province will provide a safer travel route for farming villages to transport their crops to the market and reaching larger towns such as Baghdad.
4. 500,000 people annually will benefit from six renovated railroad station in Qadisiyah Province will provide protection from the environment while the passengers wait to board the train and for the stationmaster to schedule freight movements.
5. 150,000 residents between Baghdad, Ninewa, and Wassit Province now enjoy more reliable electricity as their 15 km of electrical power feeder were installed to local distribution substations.
6. 80,000 people between Maysan, Najaf, and Ninewa Provinces now enjoy potable water with the installation of three compact water units and repair of 27 km of water line.
7. Four border forts in Maysan Province and two border forts in Al Anbar Province will increase the security along the border with Iran and Saudia Arabia, allow for the proper training of the border police, and provide additional logistical support for border patrols.
8. The completion of a Port of Entry in Ninewa province will expedite the safe passage of thousands of vehicles and persons traveling between Iraq and Syria daily.
9. Fire stations in Al Anbar, Basrah, Diyala, and Kirkuk Provinces will increase fire security for 100,000 residents in local towns and provide an excellent training facility for firefighters.
10. Completion of cluster pump station is part of an overall project to restore water injection to pre-war levels. The water injection infrastructure is critical to providing adequate pressure on the oil reservoir in the Rumaylah field and has a direct impact on crude oil production output.
(Above from CENTCOM Weekly Newsletter)
No comments:
Post a Comment